PERMITTEE MUST CALL/FAX OEM REGARDING EMERGENCY SITUATION. The central Permit Office entrance is via Vietnam Memorial Plaza between Water and South Streets. Office hours: Applications accepted, only from 8:00 AM to 11:30 AM; Report a problem. HIQA performs inspections during active construction through its completion and up to the end of the Guarantee Period. With advance notice of NYC DOT's intent to work in a particular location, utility companies and other potential street excavators are better able to make arrangements to minimize potential conflicts or to leverage the opportunity to perform their work before resurfacing or reconstruction is complete. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. WALKWAY IN ROADWAY MAY BE CLOSED 8AM- 4:30PM MON - FRI OPEN ALL OTHER TIMES. Tel: 311 or (718) 422-8700, Public Design Commission of the City of New York (PDC) Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. (5mb). Sidewalk Construction Permits apply to any repairs, replacements or new sidewalk installations. View more information and instructions for obtaining a revocable consent. More specific information on each permit type, including application procedures and fee structures are described in greater detail in Section 3.3 The Permit Application Process of this chapter. The guidance presented in the Street Works Manual does not supersede any existing federal, state or city laws, rules and regulations. HOWEVER IT MUST BE PRESENTED FOR EXTENSION NO LATER THAN 5 BUS DAYS PRIOR TO EXPIRING. IF WORK IS WITHIN 100FT OF A BRIDGE STRUCTURE, YOU MUST SUBMIT A SCALED DRAWING SHOWING THE WORK AND EXACT LOCATION. Click here to download. Designers and contractors should refer to the specifications listed below with special attention to the Construction & Material Specifications; Highway Lighting, Traffic Control, and Intelligent Transportation . Visit the DEC website at the following address to determine the appropriate contact http://www.dec.ny.gov/63.html, Metropolitan Transportation Authority (MTA) Bus Operations If the proposed location may be suitable, HIQA performs an inspection in order to confirm its suitability. Attn: Forestry All materials used for backfill must be free from bricks, blocks, excavated pavement materials and/or organic material or other debris. If there is no hold, the permit is issued to the applicant after appropriate payment is received. Any foundation material not meeting specifications must be removed. ALL SIDEWALKS IN C4-4 THROUGH C4-7, C5 & C6 COMMERCIAL DISTRICTS, AS DEFINED IN THE NYC ZONING RESOLUTION SHALL BE OF PIGMENTED CONCRETE WITH SAW-CUT JOINTS AS SET FORTH IN SEC. CONTRACTOR MAY NOT REMOVE OR RELOCATE ANY PARKING METERS OR BLOCK PUBLIC ACCESS TO MUNI-METERS WITHOUT FIRST OBTAINING APPROVAL FROM NYCDOT PARKING METER DIVISION AT 718-894-8651. 8:30 AM to 4:30 PM, Staten Island NYC Parks & Recreation
Manuals and Standards | Ohio Department of Transportation IT IS THE PERMITTEE'S RESPONSIBILITY TO COORDINATE WITH DDC'S WALL STREET WATER MAIN PROJECT EIC AT (212)791-8170 PRIOR TO BEGINNING A WORK OPERATION. 55 Water Street, Concourse Level WORK 9 PM TO 6 AM NIGHTLY. NYC DOT inspects sidewalks for defects and when a defect is identified, a Sidewalk Violation is issued to the property owner and a copy is submitted to the County Clerk's office. MAINTAIN 5 FOOT PED. Permits (hazardous storage/operations) (718) 999-2457, New York City Department of Information Technology and Telecommunications (DoITT) ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE SOUTHWEST QUADRANT OF THE INTERSECTION. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT RED LIGHT CAMERA UNIT TO OBTAIN THE CONSTRUCTION AND MARKINGS PLANS FOR THIS WORK AREA. MAINTAIN A 5 FOOT CLEAR PEDESTRIAN WALKWAY IN ROADWAY. The applicant must maintain valid insurance and a canopy maintenance permit as long as the canopy exists. Permits that have expired may be reissued only within30 daysof expiration. Applications for most permit types can be submitted to the Manhattan Central Permit Office. An explanation and description of "Holds" may be found in Section 3.5 Other Provisions Pertaining to Permits of this chapter. Manhattan check-in window hours extended to 3:30pm for Bronx work only. Customer Service: (718) 579-6920, Brooklyn (718) 391-1110 (212) 839-4700 NYC DOT may revoke a permit without affording the permittee an opportunity to be heard prior to the revocation if NYC DOT determines that an imminent peril to life or property exists. WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK MONDAY TO FRIDAY 10 AM-4 PM, SATURDAYAND SUNDAY, WITH NO NOISY OPERATIONS AFTER MIDNIGHT. FULL CORNER QUADRANT RESTORATION IS REQUIRED FOR ALL CORNER QUADRANTS EXCAVATED. Click here to view a sample certification formand in Appendix B, Forms. Canopy (CAN) hold A CAN hold is automatically placed on a canopy maintenance permit application until a HIQA inspector performs a final inspection confirming the submitted plans. All street lighting designs must be approved by DOT Street Lighting Engineering Unit. They should be clear, readable and in letters at least 1" in height, and conform to all NYC DOT specifications. PERMITTEE MUST NOTIFY SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. All Street Opening permit types usually allow for work within 300 linear feet by a width of 12 feet. 120-55 Queens Boulevard, Ground Floor, Room G-210 Programming activates roadways, sidewalks,and pedestrian plazas, andis essential to the ongoing success of any public space. THIS STIP IS USED FOR BPP PLANS AND REQUIRES THE CONTRACTOR TO RESTORE HALF THE ROADWAY PLUS 5'. (See Chapter 4, Section 4.5 Street Construction Inspections and Enforcement regarding the circumstances in which CARs may be issued.). RESTORE PAVEMENT AFTER SUFFICIENT TIME FOR CURING. 8FTRES-RESTORE AS PER SKETCH #1 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. By accessing this map portal, a utility company or any other entity that performs street excavation work can find details on NYC DOT projects included in the city's 10-year Capital Budget, as well as more imminent NYC DOT and New York City Department of Environmental Protection capital projects currently in design or under construction. Click here for a list of current construction embargoes. Permits reissued after three business days must be subject to the full permit fee. CNRRES-RESTORE AS PER SKETCH #6 OF DOT'S PROTECTED STREET RESTORAITON REQ'MENTS. Permit Management & Construction Control Permit by Mail CONSTRUCTION ZONE LAYOUT MUST BE IN ACCORDANCE AND COMPATIBLE WITH ANY AND ALL NYC DEPARTMENT OF BUILDINGS (DOB) AND NYC FIRE DEPARTMENT (FDNY) FIRE AND EMERGENCY EVACUATION REGULATIONS/CODES AND PRACTICES. PHONE # (508) 429-6023. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR BUILDING LINE TO BUILDING CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. All CGL insurance policies must contain the following cancellation clause: In the event of expiration or cancellation of any such policy, the company will give the Permit Office at least 30 days' written notice prior to such expiration or cancellation. OCCUPY ONE 11 FOOT LANE 10 PM TO 12 PM NIGHTLY. New York, NY 10038 PERMITTEE MAY ALSO OCCUPY ONE TRAVEL LANE ADJACENT TO EAST CURB LANE 830PM TO 4:30AM.NIGHTLY FROM 10/4 THROUGH 10/15. The milling and resurfacing schedules are organized by borough and are sent electronically each week to utility companies and other city agencies. State Standard Drawings See the state links below for available standard drawings. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. THE CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE THE FINAL RESTORATION STARTS SO THAT HIQA CAN MONITOR THE WORK. APPROVAL FROM NYCDOT HIQA BOROUGH OFFICE IS REQUIRED BEFORE WORK COMMENCES. NO EQUIPMENT/MAT'L MAY BE PLACED ON TOP OF SENSORS. If the request is approved or modified, then all conditions, restrictions, fees and application procedures for obtaining a construction-related permit apply. WORK MAY OCCUR FOR MSO ONLY FROM 7PM FRIDAY TO 6:00AM MONDAY, 24 HRS A DAY. 1400 Williamsbridge Road, 2nd Floor SignageSigns must be displayed at the work site or at 100-foot intervals along a series of excavations or continuous cuts indicating the name of the entity performing the work, the name of the entity for whom the work is being performed and, if applicable, the name(s) of the subcontractor(s). Bronx, NY 10461 OCCUPY TWO 11 FOOT LANES 12:01 AM TO 5 AM NIGHTLY. This category of permits applies to construction-related activities that take place within the street and are generally associated with construction work adjacent to the street. The purpose of placing a street in protected status is to maintain the integrity of a new street surface. The Poles and Luminaires chart identifies which combinations of poles and luminaires are permitted. DOT Street Lighting evaluates LED luminaires using the IES BUG (Backlight, Uplight, and Glare) rating system as part of its specifications. Typical treatments include removing vault roof near curb, filling flowable lifts, and breaking vault floor. Please note all fields marked with an asterisk (*) on application must be completed. The permit to maintain the canopy will remain on hold until after the canopy is installed and inspected. ). 210 Joralemon Street, 8th Floor Any of these holds will prevent a permittee from applying for new permits: New York City Department of Finance (DOF or Finance) hold If a permittee has failed to pay previously issued summonses/Notices of Violation (NOVs) to the New York City Environmental Control Board (ECB), all future permit requests may be placed on hold until the fees associated with the outstanding summonses/NOVs are paid. DOT Street Lighting's Standard Drawings Book [PDF] includes Standard drawings for elements in the lighting catalogue. Any work is subject to suspension during an NYC DOT-issued. 80-30 Park Lane To request a release of a SAM hold, the borough ASHO must be contacted to discuss the work and allow the ASHO to determine the extent of the restoration requirements. Canopy authorizations and permits are required to place a canopy over the sidewalk.
Street Works Manual To request release of a RED hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed. Cranes may require permits from DOB in addition to NYC DOT. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPLUATED HEREIN. An online permit processing application significantly enhanced the efficiency of NYC DOT permitting operations. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. WORK 9 AM TO 7 PM EXCEPT SUNDAY. Office hours: 8:30 AM-4:30 PM, Staten Island CTDOT_Traffic . The latest edition is available for purchase for $50 from the Office of the Agency Chief Contracting Officer, 55 Water Street, Ground Level, New York, NY, 10041. Further information is available in Section 2-02 (c) of Highway Rules. 40 Worth Street 8th Floor Canopy placement must be approved by the owner of the property to which the canopy will be attached. PRIOR TO PERFORMING ANY NON-EMERGENCY WORK WHICH IMPACTS AUTHORIZED PARKING, THE CONTRACTOR SHALL NOTIFY & COORDINATE WITH NYC DOT AUTHORIZED PARKING UNIT AT: BARCLAYS CENTER (ATLANTIC YARDS) EVENTS.
UPON COMPLETION OF INSPECTION, THIS PERMIT SHALL BE RELEASED OR REJECTED BY THE HIQA UNIT. WORK 7PM TO 11PM MON. A list of the forms most commonly used during this process can be found inAppendix B, Forms. OFF-SITE STORAGE MUST BE PERMITTED SEPARATELY. Inevitably, street excavations to install or access this infrastructure disrupt the normal activity of New York's streets, causing frustration and confusion for local residents and businesses. THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION & WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS. The second option is available for applicants who do not have the technology to use the above procedure. A permit is required to place any construction trailer or similar structure in the street. All addresses must be the same on all above referenced documents. POST "NO STANDING 7AM- 6PM M-F" SIGNS ON THE NORTH CURB. Enter all persons authorized to obtain permits for the applicant, their affiliation to the applicant and their telephone number and email address. If the application and its supporting documentation are accepted, the OCMC Project Manager (PM) reviews the application and all associated documents and adds the permit stipulations to the permit application. THE SIGN MUST BE PLACED AT A HEIGHT OF 7 TO 10 FEET AND STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF THE CLOSURE. 22 Reade Street Attn: Forestry http://mutcd.fhwa.dot.gov back to top N New York 811, Inc. Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). For hearings, Monday to Friday from 8:30 AM to 3:30 PM. PROVIDE 5 FEET FOR PEDESTRIANS ON SIDEWALK OR IN CURB LANE. New York 811 then relays digging and excavation requests to its member network of utility companies and underground facility owners, who are required to mark the location of their underground facilities within two working days. If the applicant does not accept the permit stipulations, he or she can request a review with the PM. The Bronx The following procedures must be followed to obtain either an emergency authorization number (EAN) for emergency utility access cover work or an Emergency Street Opening Permit Number for emergency street opening work. It also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. It is important that contractors and utility companies are responsible partners as well in order for coordination to be effective. CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE REPLACING COBBLESTONES SO HIQA CAN MONITOR THE REPLACEMENT. CTDOT_Traffic_STD.zip All links are subject to change. VARIANCE GRANTED TO WORK DURING THE"HOLIDAY" EMBARGO-NOVEMBER TO JANUARY, AS STIPULATED BY THE OCMC OFFICE. Additional requirements are contained in Sections 2-02 and 2-05 of the Highway Rulesand should be consulted before any work is performed on the street. Applicants should indicate on the application, Application for Governmental Work Permit(s), their name and the name of the governmental agency or authority for which they are working. AND SUN. MAY ALSO WORK 7PM TO 11PM WEEK DAYS ONLY FOR THE PURPOSE OF DEP INSPECTION WITH INSPECTOR ON SITE. The Protected Streets Listing consists of four separate files, each covering all five boroughs: All streets on the "Active/Future" lists show the anticipated start date of the project. Real-Time Traffic Conditions & Cameras. NYC Parks & Recreation Call before you dig. DOTMap also features a protected streets layer, enabling utilities and other potential street excavators to view which streets are protected and for what period of time. FULL CURB TO CURB RESTORATION WILL BE REQUIRED FOR THE ENTIRE LENGTH OF THE WORK. Other conditions may apply, such as a variation in the distance and width of the job, which may increase the fee required. CONTRACTORS SHALL NOTIFY POLICE, FIRE, EMS, COMMUNITY BOARDS, AND ABUTTING PROPERTY OWNERS 48 HOURS PRIOR TO CONSTRUCTION. Street work at Third Avenue and Saint Marks Place, Manhattan as part of a larger Cooper Square area reconstruction project. VERMEER CUT OF TRENCH. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. Key principles for effective coordination include: Provide Notice of Planned Street work at Earliest OpportunityThe basic principle of providing adequate advance notice is the greater the disruption, the longer the notice period needed. PROJECT COORDINATED THROUGH PLANNING & SUSTAINABILITY FOR PILOT PROGRAM. The citys Climate Resiliency Design Guidelines[PDF] provide guidance on height. Advance notice and coordination of planned street work is one of the most effective tools for reducing the number of street excavations, especially on streets that are scheduled to be resurfaced or reconstructed. Different from DOB, DOT plans requires 600 PSF live loads on all sidewalk doors, gratings, covers and vault structures. Outlined below are the basic application procedures for Street Opening Permits. NO WORK IS TO BE PERFORMED WITHIN A BLOCK FRONTING A SCHOOL INCLUDING INTERSECTIONS FOR ONE HOUR PRIOR TO SCHOOL START TIME THROUGH ONE HOUR AFTER END OF SCHOOL TIME. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Whenever a permit has been issued in error and the conditions are such that the permit should not have been issued. The violation provides a property owner 75 daysto make repairs (see the Sidewalk Repairs section above for further details). MAINTAIN 1 - 11 FOOT LANE ON ONE-WAY STREETS AND TWO 11 FOOT LANES ON TWO-WAY STREETS. PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND,YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. SIGNS SHALL BE POSTED MIN OF 48-HRS PRIOR TO START OF WRK & IMMEDIATELY REMOVED UPON COMPLETION OF WRK OR PERMIT EXPIRATION. ALL MITIGATIONS INCLUDING: VARIABLE MESSAGE BOARDS, NYPD INTERSECTION TRAFFIC AGENTS, CONSTRUCTION, PARKING, AND BUS STOP SIGNAGE MUST IN PLACE AND MAINTAINED FOR THE LIFE OF THE PROJECT. Bronx, NY 10458-5891 THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. THE PERMITTEE MUST HAVE APPROVAL FROM NYCDOT STREET LIGHTING FOR INSTALLATION/REPLACEMENT OF POLES. Tel: 212-720-3300
Bronx, NY 10462 Please open each of the below search results in a new tab or window (using a right-click or CTRL-click) to alleviate an occasional error that may occur when using a browser's back button. InspectionsAll work performed in the street is subject to inspection by the HIQA unit. FULL CURB LANE RESTORATION WOULD BE REQUIRED FOR 8' WIDTH OF CURB LANE AND THE LENGTH OF ALL CUTS PLUS ANY LL14 CUTBACKS. The Standard Sheet Books are also available as compiled .pdf files for the critical letting dates for which they were applicable. Further information on insurance and bonds is available in Chapter 3 Permits and Approvals and in Section 2-02(a) of the Highway Rules. No attachments of any kind are permitted on a canopy, including, but not limited to temporary or permanent signs, balloons, streamers, flags, banners or pennants. Tel: (718) 815-8541 on hearing days 95 Prospect Park West Office hours: 8:30 AM to 5:00 PM, From 7:00 AM to 3:30 PM, Monday to Friday, call: (212) 839-9660/61/62 Staten Island, NY 10301 A Certificate of Insurance may be provided as proof of insurance coverage only if accompanied by a certification form by the insurance broker or insurance company attesting to the accuracy of the coverage described on the certificate. THIS STIP IS USED FOR WORK THAT FALLS BETWEEN LANES AND REQUIRES THE CONTRACTOR TO RESTORE THE ROADWAY FROM 1' PAST THEIR RESTORATION TO THE NEAREST CURB FOR THE LENGTH OF THEIR WORK. Corner TreatmentThe two slope lines meeting at the intersection of the two building lines must drop from a common point at the building corner toward their respective curbs at a rate within the limits prescribed in the Highway Rules. THIS EXECPTION DOES NOT APPLY IF STIPULATION 014 IS ALSO APPLIED TO THIS PERMIT. or Tax I.D. nyc.gov/dot. Based on the documents submitted, HIQA makes a preliminary determination as to whether the proposed location may be suitable for a canopy. Long Island City, NY 11101 Several forums are in place to provide advance notice of city capital projects. Brooklyn, NY 11201 The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. DOT is also testing solar-powered lighting at select locations in flood-prone areas. For hearings, 1st, 2nd, 3rd, and 4th Wednesdays and Thursdays of the month from 8:30 AM to 3:30 PM If all information is satisfactory, EAU will fax or call the applicant with an EAN, which must be available at the work site and presented to any governmental employee upon request. Fax: (212) 860-1359 For Further Information: Canopy permits are not transferable from person to person or from the location of original issue.
4.0 Executing Work in the Street - Streetworksmanual.nyc The Department of Transportation (DOT) maintains and installs New York City parking regulation signs. ONLY FOR CORRECTIVE ACTION FOR SPECIAL EVENTS. (212) 839-8980 Contact PEU for further information regarding the procedure to obtain initial and final approval for a transformer vault. BQE Central Workshops. Department of Transportation Minimum slopes should be used wherever possible. Connecticut Department of Transportation All other inquiries: (718) 222-7207 Concrete (CON) hold All permits issued to work on concrete portions of the roadway are automatically placed on hold until a HIQA inspector performs an inspection of the work site to establish existing conditions before work begins. It also helps NYC DOT to identify opportunities for joint bidding and to coordinate the timing of the agency's resurfacing and reconstruction activities. DOT Street Lighting's, Permeable Interlocking Concrete Paver (PICP), Illuminating Engineering Society of North America. Winter holiday embargoThe winter holiday embargo typically starts in mid-November and lasts through January 2. Due to upcoming major building rehabilitation at 1400 Williamsbridge Road. This chapter describes the basic steps for performing work in the street, for restoring the street after work is performed, and for responding to each type of notice or request that may be issued during a Highway Inspection and Quality Assurance (HIQA) inspection. Utility companies, developers, contractors, and excavators who undertake any type of construction that will impact the street or occupy it with equipment, structures or other installations must obtain a permit. SUMMER RELIEF SYSTEM UPGRADE. Street excavations must be performed in accordance with Section 2-11 (e) of the Highway Rules. New York, NY 10004 WITHIN THIS TIME FRAME ONE WAY ROADWAYS LESS THAN 39FT. Office hours: 8:30 AM-4:30 PM, Brooklyn Prior to any permit revocation, NYC DOT will give the permittee an opportunity to be heard with not less than two days' notice. COMPLY WITH DOT STANDARD #H1042C. NYC DOT disclaims any liability for omissions or errors that may be contained herein. The minimum slope, calculated on a line perpendicular to the curb, must be 1" in 5', and the maximum is limited to 3" in 5'. Section 2.3 Key Principles for Effective Notice and Coordination of Planned Street Work, Section 3.3 The Permit Application Process, Section 3.6 Emergency Work and Special Circumstances, http://www.nyc.gov/html/dot/downloads/pdf/insurancereq.pdf, Instructions for Permittee Registration Application, Application for Roadway/Sidewalk Permit(s), Appendix A, Common Permit Types and Documents Needed, Appendix D, Other Agency and Utility Contact Information, Application for Governmental Work Permit(s), Section 3.5 Other Provisions Pertaining to Permits, Application to Renew Governmental Permit(s), The permit application is available online, Chapter 4, Section 4.5 Street Construction Inspections and Enforcement, Request for Roadway/Sidewalk Permits during Embargo Periods form, Section 4.3 Street Restoration Requirements, Building Operations/Construction Activity Permits, Minimum Clearance Requirements For Transformer Vaults, Department of Design and Construction, Construction Director Borough Offices, Department of City Planning Borough Offices, Department of Parks and Recreation Borough Offices, Environmental Control Board Borough Offices, Chapter 2Advance Notice and Coordination of Planned Street Work, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Street Arterial Maintenance (SAM) Release Form for Protected Streets, Application to Renew Governmental Work Permit(s), Application to Reissue Governmental Work Permit(s), Written Consent from Property Owner to install and maintain a canopy, Temporary Construction Signage Purchase Directions, Construction Project Information Signs (CPIS) Directions, Engineering Package for Vault Application, Section 3.4 Canopy Authorization and Permits, Weekly milling, resurfacing and concrete repair schedules, Insurance and Indemnification Requirements from Title 34, Rules of the City of New York, Critical Streets list in the Highway Rules, Section 2-07 (c) (5), Franchise, Concession or Revocable Consent, Application to Re-issue Government Permits, Additional information about historic districts, Construction Embargos at the Special Traffic Advisory link, Request for Roadway/Sidewalk Permits during Embargo Periods, Information regarding sidewalk violations, Pave Street-W/ Engineering & Inspection Fee, Place Equipment Other Than Crane Or Shovel, Franchise Installations (Overhead Structures), Electric power lines, cables, conduit and lighting cables, Gas, oil, steam, petroleum and gaseous materials, Communications, alarm, signal lines, cables and conduit, Reclaimed water, irrigation and slurry lines, REQUIRES DOB APPROVAL or REQUIRES DOT FRANCHISE, CONDUIT CONSTRUCTION (CABLE, TELECOMMUNICATION) AND FRANCHISE, REQUIRES DOT HIGHWAY INSPECTION QUALITY ASSURANCE (HIQA) APPROVAL, REQUIRES APPROVAL FROM DOT SIGNALS UNIT or, REQUIRES DOB APPROVAL (IF IN CONJUNCTION WITH A NEW BUILDING OR BUILDING ALTERATION), FRANCHISE INSTALLATION (OVERHEAD STRUCTURE), REQUIRES APPROVAL FROM DOT STREET LIGHTING UNIT, Franchises, Concessions and Consents - (212) 839-6550, MTA/NYCT - Bus Operations - (646) 252-5517 or (646) 252-5544, 18 inches (maximum 24 inches) from the grating edge perpendicular to curb, Division of Review & Construction Compliance - (718) 595-5223 or Plan Review Section - (718) 595-5191, * Maintain minimum Clear Path requirement (Below), General customer service - (800) ASK-USPS, 5 feet offset along the curb line (Not Permitted in front), Department of Consumer Affairs - 311 or (212) NEW-YORK outside the five boroughs, Con Ed, Verizon, National Grid, etc. 8:30 AM to 4:30 PM, Manhattan FULL BUILDING LINE RESTORATION IS REQUIRED FOR WIDTH OF THE ROADWAY. New York City streets include a complex mix of assets such as electric, gas, telephone, cable, water, sewer and steam lines, requiring coordination among the different asset owners when street work is performed. PHONE#508-429-6023. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN, ALL TEMPORARY TRAFFIC CONTROL DEVICES, INCLUDING BUT NOT LIMITED TO SIGNS, CHANNELIZING DEVICES, FENCING AND MARKINGS SHALL BE PROVIDED, INSTALLED, MAINTAINED AND REMOVED BY THE PERMITTEE IN ACCORDANCE WITH THE MOST RECENT VERSION OF PART 6 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD). NYC DOT Standard Highway Specifications, May 16, 2022 NYC DOT Standard Details of Construction, June 6, 2022 Sewer and Water Main NYC DEP Standard Sewer and Water Main Specifications, August 8, 2022 NYC DEP Specifications for Trunk Main Work, July 2014 NYC DEP Water Main Standard Drawings, December 2020 NYC DEP Sewer Design Standards, August 2018 THE PERMITTEE MAY BE REQUIRED TO PAY STATION DEACTIVIATION AND/OR REMOVAL CHARGES. Bureau of Permit Management and Construction Control WHEN APPLICABLE, NYCT OR PRIVATE BUS COMPANIES MUST ALSO BE NOTIFIED. CONTRACTOR/PERMITTEE IS REQUIRED TO POST AND MAINTAIN ADVISORY SIGNS A MINIMUM OF48 HRS PRIOR TO CHANGING EXISTING PARKING REGULATION SIGNS TO APPROVED TEMPORARY CONSTRUCTION PARKING REGULATION SIGNS. Bronx.Forestry@parks.nyc.gov FIRE/EMERGENCY ACCESS/EVACUATION POINTS FOR ALL BUILDINGS CANNOT BE ENCROACHED. All borough Permit Offices accept money orders, company checks, certified checks and most major credit cards for permit fees. Upon a satisfactory inspection, the hold(s) will be released. CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR RESTORATION OF CUT CONFINED TO WITHIN 8 FEET OF THE CURB LINE IN ACCORDANCE WITH NYCDOT RULES AND REGULATIONS FOR PROTECTED STREETS. OCCUPY 15 FEET OF E/S CURB LANE. Sidewalk Construction Permits are generally taken out by entities that need to perform work on sidewalks, including developers, contractors, and private homeowners (for sidewalk repairs and only if performing the work themselves).